Table of contents
No headers
- Make sure that the SCHED catalogue is updated when a DBBC (or other new equipment) is taken into production. Friends should send information to Campbell.
- All: check out the spare part list on the wiki and make sure that each institute contributes.
https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/EVN_spare_parts - Bach/Alef: Look for new possibilities to implement phasecal.
- All L- and C-band stations: determine beam shapes at L- and C-band, if possible at
different elevations. Send results, as well as the elevation intervals used, to Keimpema.