Current_Action_Items

    Table of contents
    No headers

    Version as of 01:52, 14 May 2024

    to this version.

    Return to Version archive.

    View current version

    1. Make sure that the SCHED catalogue is updated when a DBBC (or other new equipment) is taken into production. Friends should send information to Campbell.
    2. All: check out the spare part list on the wiki and make sure that each institute contributes.
      https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/EVN_spare_parts
    3. Bach/Alef: Look for new possibilities to implement phasecal.
    4. All L- and C-band stations: determine beam shapes at L- and C-band, if possible at
      different elevations. Send results, as well as the elevation intervals used, to Keimpema.