Table of contents
No headers
- All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
- All: Upgrade to SDK9.4 first at the correlators then at the station.
- All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration
- All: provide frequency information of the stations to de Vicente
- All: If a station is not buying a FlexBuff, purchase disk packs
- Szomoru: ask Keimpema to re-send email to stations requesting beam maps
- Blanchard: collect cases of bandpass dips to present to Tuccari.
- Rottman: Define proper policy for release of firmware versions
- Vicente: talk to Himwich about possibility to inject opacity information into FS logs.
- Jung: write down instructions for high frequency gain/opacity corrections. Circulate this among EVN members.
- Blanchard: come up with a method to use correction solutions of good stations for bad stations
- Blanchard: compare amplitude calibration results from both continuum calibration scripts
- All: everybody to switch to DBBC firmware DDC V106
- All: everybody to use last Fila10G firmware
- Bach: schedule 43 GHz test in May
- de Vicente: Contact stations and work out how to ship RFI measurement equipment (BRAND project)
- Szomoru: contact KVAZAR network when the next eVLBI session date is known for possible participation.
- Bach: find out which stations can match the observing band for 4 Gbps observing
- Blanchard: setup EVN Github