Current_Action_Items

    Table of contents
    No headers

    Version as of 21:09, 28 Apr 2024

    to this version.

    Return to Version archive.

    View current version

    1.  All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
    2. All: Upgrade to SDK9.4 first at the correlators then at the station.
    3. All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration
    4. All: provide frequency information of the stations to de Vicente
    5. All: If a station is not buying a FlexBuff, purchase disk packs
    6. Szomoru: ask Keimpema to re-send email to stations requesting beam maps
    7. Blanchard: collect cases of bandpass dips to present to Tuccari.
    8. Rottman: Define proper policy for release of firmware versions
    9. Vicente: talk to Himwich about possibility to inject opacity information into FS logs.
    10. Jung: write down instructions for high frequency gain/opacity corrections. Circulate this among EVN members.
    11. Blanchard: come up with a method to use correction solutions of good stations for bad stations
    12. Blanchard: compare amplitude calibration results from both continuum calibration scripts
    13. All: everybody to switch to DBBC firmware DDC V106
    14. All: everybody to use last Fila10G firmware
    15. Bach: schedule 43 GHz test in May
    16. de Vicente: Contact stations and work out how to ship RFI measurement equipment (BRAND project)
    17. Szomoru: contact KVAZAR network when the next eVLBI session date is known for possible participation.
    18.  
    19. Garcia Miro: find suitable date for real-time fringe test, possibly during next e-VLBI run of June 20
    20. Blanchard:  setup EVN Github