Table of contents
No headers
- All stations to measure beam-maps at L- and C-band (provided appropriate software is available at the telescopes) and send them to Keimpema. Update the table at https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
- Upgrade to SDK9.4 first at the correlators then at the stations.
- All stations (except Wettzell): implement 80 Hz continuous calibration. https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29
- Verkouter to send out script of Quick to save logfiles to all stations.
- Lindqvist to talk to Kvasar friends about possibility (and need) to provide Tsys.
- Szomoru to send out document to all stations dealing with the upgrade of Mark5 to Wheezy OS and SDK9.4.
- All stations: contact Vicente for explanation on method how to improve K-band calibration using sky-dips
- Himwich: implement dbbc=version, fila10g=version query in sched_initi or exper_initi in the FS
- Verkouter: implement jive5ab=version query
- Himwich: implement query in FS to ask for jive5ab version
- JIVE: set up a wiki page, summarizing problems per station. Stations must give response before each TOG.
- Campbell, Quick, Gunn, Himwich, Vicente, re-think way of distributing schedules, to prevent wrong schedules from being observed
- Vicente, send script he wrote for similar purpose as described in action 9. to Duev.
- Vicente, attempt to raise priority of VLBI at Jb at the CBD
- All: fill out the table on TOG wiki with available equipment.
- Campbell to come up with realistic numbers for disk space needed, both for disk-shipping and FlexBuff stations.
- Quick, Cambell, Vicente discuss SCHED, contact Amy Mioduszewski and Cormac Reynolds about Pointing sector and DBBC version handling.