Table of contents
Table with the current status of the EVN stations for the continuous calibration (band dependent)
Current status of the continuous calibration implementation at the stations
L Band | C band | M band | X band | K band | Q band | Last updated | |
Ar | |||||||
Bd | |||||||
Ef | Available | Available | Available | Available | Available | Available | 18-06-2015 |
Hh | Available | Available | Not yet | Not yet | Not yet | - | 11-10-2022 |
Jb | 80 Hz | 80 Hz | 80 Hz | - | 80 Hz | - | 04-04-2019 |
KVN | - | - | - | - | No | No | 10-06-2015 |
Mc | Available | Available | Available | Available | Available | - | 2-04-2019 |
Mh | - | - | - | No | Available | No | 10-04-2019 |
Nt | Available | Available | Available | Available | Available | Available | 05-05-2020 |
On | Available | Available | Available | Available | No | No | 11-07-2018 |
Ro | Available 10Hz | N/A | N/A | Available 10Hz | Not yet | Not yet | 3-10-2017 |
Sr | Available | Available | Available | 22-01-2021 | |||
T6 | Available | Available | Available | Available | Available | Not yet | 6-5-2021 |
Tr | Available | Available | Available | Available | Available | - | 08-02-2022 |
Sh | |||||||
Sv | |||||||
Ur | |||||||
Wb | not going to implement on current Receiver because too much effort | not going to implement on current Receiver because too much effort | not going to implement on current Receiver because too much effort | not going to implement on current Receiver because too much effort | 29-01-2019 | ||
Ys | - | 80 Hz | 80 Hz | 80 Hz | 80 Hz | No | 8-02-2022 |
Zc | |||||||
Ir | Not yet | Not yet | Not yet | Not yet | N/A | N/A | 6-11-2019 |
- The DBBC allows to detect synchronously an 80 Hz signal integrating the power from the cal off and cal on phases.
- The 80 Hz signal can be obtained from output "Cont Cal".
- Continuous cal can be enabled by typing:
- cont_cal=on (at the FS)
- In some cases the signal is inverted and you can get negative Tsys. This is a pending issue to be solved. It can be solved by patching the FS, but this solution should be avoided in the future and look for a cleaner one. The DBBC allows to invert the signal but this does not work at V105 version yet.
- The file of station.prc should be ready to switch between continuous calibration for some bands and traditional calibration for others. How to properly set it? See the document of /usr2/fs/misc/dbbc.txt
- Note that your noise source should have a Tcal on the level of ~1 K rather than ~10 K.
- Onsala -- we have just tested the latest firmvare DDC V105 (version on 2015 Jun 10) which allows to swap the total power sampling between the Cal-On and Cal-Off registers. Now, our FS can do the proper measurements of Tsys, On-off, and Fivept at Onsala. The system is functional now. We have switched it on during N15L3. We are going to reduce Tcal from ~10 K to ~1 K and then start to use it in the user experiments at L and C bands in session 1/2016. The X-band 80Hz calibration hardware is also ready now and will be installed when the manpower is available.
- Hart -- we are working on implementing this on our 15m first as a test bed to see how well our solution will work. At the moment we are still waitin gon components for that.