Current status of EVN observatories
Due to the current health situation around the world some observatories have limited staff available, have reduced observing times. or closed their facilities. For an overview please indicate in the table below the status of your observatory. Thanks
Station | Comment |
Arecibo | Regular observations (since 30.03.2020) |
Badary | Regular observations (25.04.2020) |
Effelsberg | Still regular observations, limited technical support. (23.03.2020) |
HartRAO | Under lockdown as of March 26th. Remote operation continuing, but no technical support. Update April 14th. Geodesy declared av essential service, so technical support now also possible. Lockdown extended until at least the end of April, but regular (remotely operated) observations continue. |
Irbene | Currently no impact on observations |
JIVE | Working at home till May 20, 2020. See note. |
Jodrell & MERLIN | closed since March 17, 2020. |
Kunming | Regular observations. CE-4 observations(when EL>7 degree) except between16th to 23rd every lunar month. (03.04.2020) |
KVN | Regular observations. |
Medicina | Update 24/03. The city of Medicina completely locked down (none allowed to leave or enter) due to worrying spread of the infection. Some colleagues live inside this red zone and cannot leave their homes. The station, even if is is outside the restricted area, can be accessed by a very limited number of people. The telescope is still idle for the technical problem that forced us to skip the previous session. The maintenace, orginally planned for March the 9th, was postponed to a to-be-defined date. Update 14/04. Lock down on city of Medicina has been relaxed. Nontheless, restrictions are extended to May the 3rd by National Goverment. No developments regarding operations will be possibie before this date. |
Metsähovi | Still regular observations, limited technical support (update: 16.4.2020). |
Nkutunse | |
Noto | Update 24/03. At the moment, virus spread seems to be under control in Sicily. Nevertheless due to the regulations and restrictions imposed by Goverment we can have very limited number of people at the station. The telescope is still idle for the technical problem that forced us to skip the previous session. The maintenace, orginally planned for March the 16th, was postponed to a to-be-defined date. Update 14/04. Restrictions are extended to May the 3rd by National Goverment. No developments regarding operations will be possible before this date. |
Onsala | Update 14/4: 20 m: geo-VLBI sessions done remotely from home. Single-dish stopped. We will try to prepare for mm-VLBI on 22/4. Best effort basis. Very limited support. Update 14/4: 25 m: We may possibly be able to take part in the May 12-13 e-VLBI session. However, we would need to know the observing band several days before, at least a week. At the moment we have L-band installed. That will not change unless we hear from the Scheduler. Best effort basis. |
Robledo | Under lockdown as of March 13. Remote operation continuing, but no technical support. (24.03.2020) |
Sardinia | Update 14/04. Sr is still observing. However due to INAF regulation and Government restrictions (phase 1 should end on May 4th), only a couple of people can be at the telescope at the same time. We need daily authorization by our Director to go either to the institute (99% of employees works from home) or to the telescope. |
Svetloe | Regular observations (25.04.2020) |
T6 (Shanghai) | Update 9/5: Antenna maintenance The upper structures of the Tianma telescope with around 1300 tons include the rational pitch mechanism, back-up structure, quadripod and sub-reflector. We are preparing for lifting the upper structures and welding the pitch axes. This work will last about more than one month, from 15th April to 29th May. We will miss the e-VLBI session on 12th May, and the regular session II may also be affected. |
Torun | Still regular observations, limited technical support. (24.03.2020) |
Urumqi | Back in normal operation. (23.03.2020) |
Westerbork | Still regular observations, remote operations, some engineers still on site. |
Yebes | [Update 20/4] Remote operation with limited technical support. No dates available for returning to nominal operation. |
Zelenchukskaya | Regular observations (25.04.2020) |