Continuous calibration

    Version as of 08:06, 27 Nov 2024

    to this version.

    Return to Version archive.

    View current version

    Table with the current status of the EVN stations for the continuous calibration (band dependent)

     

    Current status of the continuous calibration implementation at the stations

     
      L Band C band M band X band K band Q band Last updated
    Ar              
    Bd              
    Ef              
    Hh              
    Jb              
    KVN - - - - No No 10-06-2015
    Mc No(work in progress) No(work in progress) No(work in progress) No(work in progress) No(work in progress) - 11-06-2015
    Mh - - - No Tested in lab No 09-06-2015
    Nt              
    On Available Available Available Available No No 15-06-2015
    Sr              
    T6              
    Tr              
    Sh              
    Sv              
    Wb in progress in progress in progress in progress     15-06-2015
    Ys - 80 Hz 80 Hz 80 Hz not tested No 5-06-2015
    Zc              

     

    • The DBBC allows to detect synchronously an 80 Hz signal integrating the power from the cal off and cal on phases.
    • The 80 Hz signal can be obtained from output "Cont Cal".
    • Continuous cal can be enabled by typing:
      • cont_cal=on (at the FS)
    • In some cases the signal is inverted and you can get negative Tsys. This is a pending issue to be solved. It can be solved by patching the FS, but this solution should be avoided in the future and look for a cleaner one. The DBBC allows to invert the signal but this does not work at V105 version yet.
    • The file of station.prc should be ready to switch between continuous calibration for some bands and traditional calibration for others. How to properly set it? See the document of /usr2/fs/misc/dbbc.txt
    • Note that your noise source should have a Tcal on the level of ~1 K rather than ~10 K. 
    • Onsala -- we have just tested the latest firmvare DDC V105 (version on 2015 Jun 10) which allows to swap the total power sampling between the Cal-On and Cal-Off registers. Now, our FS can do the proper measurements of Tsys, On-off, and Fivept at Onsala. Most likely, we will start to use it in EVN session 3/2015.