2019 Oct (c192)

    Version as of 23:21, 3 May 2024

    to this version.

    Return to Version archive.

    View current version

    General session information:

    block schedule

    Storage requirements

    Stations Obs time [hrs] total volume [TB] @4Gbps Recording
    VLBA 39 36 Mark6
    Ys, On, Mk, Eb 38 +2 36 local & etransfer
    Pv 38 +2 36 Mark6
    KVN 36 32.5 local & etransfer
    GLT 45 40.5 Mark6

    assuming a duty cycle of 50%.

    Correlation Status

    Project

    Code

    Block

    Code

    Sources DOYS UT Freq Stations Status PI Comment
      f192a         Ef,On,O6,Ys,Mh,Pv,P3     fringe check
      c192a                
      c192b                
      c192c                

    General comments

    • Ys has switched the IF configuration with c192b from using A/C to A/B. The first affected scan is no0053. The change was done due to a faulty calibration of board C which led to lower amplitudes in LCP prior to the change.