F192A

    F192A Correlation Report

    Fringes

    Station Code Fringes Plots Comments
    Ef B yes No0002_B.pdf Effelsberg DBBC2
    Eb E     Effelsberg RDBE
    On X yes No0002_X.pdf Onsala DBBC2 v107_beta3
    O6 O yes No0002_O.pdf Onsala DBBC2  v107 beta4
    Mh Z yes No0002_Z.pdf thick clouds and rain
    Ys Y yes No0002_Y.pdf clear skies
    Pv P yes No0002_P.pdf

    DBBC2
    clear sky with some high-altitude clouds. Tau=0.25.
    Issues with telescope system, joining test late, missed scan 1.

    P3 i yes No0002_i.pdf DBBC3 backend at PV

    Notes

    • Ys: LCP fringes are weaker than RCP. This could be attributed to the board serving LCP (C) not being properly calibrated. During c192b the LCP IF was switched to board B.
    • P3: Phases needed to be manually alligned. SNR  is comparable to DBBC2. However LL Fringes are somwhat weaker due to a drop in amplitude for the last 4 BBCs of board A. The reason for this drop needs to be investigated.
    Tag page (Edit tags)
    • No tags
    Pages that link here
    Page statistics
    1196 view(s), 23 edit(s) and 3348 character(s)

    Comments

    You must login to post a comment.