T241A Ef-Nn-Pv

This page can't be edited. | Page History
    Table of contents
    You are currently comparing two old versions - only when you are comparing against the latest version can you revert. Return to version archive.

    Combined revision comparison

    Comparing version 13:02, 20 Mar 2024 by gfparaschos with version 13:03, 20 Mar 2024 by gfparaschos.

    ...

    • Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
    • Goal: Find fringes for upcoming EHT observations and test if Nn phase jumps have been eliminated.Station feedback: Good conditions at Nn (pad N011) also resetting the polyfix 6 (affecting LCP), Pv switchbox issue (LCP has low power), Ef had thick clouds, data after 8:05 UT should be better
    Status
    Station Fringe date comments
    Ef Yes 19.03.2024

    Ef had thick clouds, data after 8:05 UT should be better

    Nn Yes 19.03.2024 Good conditions at Nn (pad N011) also resetting the polyfix 6 (affecting LCP)
    Pv Yes 19.03.2024 Pv switchbox issue (LCP has low power),

    ...


    Version from 13:02, 20 Mar 2024

    This revision modified by gfparaschos (Ban)

    ...

    • Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
    • Station feedback: Good conditions at Nn (pad N011) also resetting the polyfix 6 (affecting LCP), Pv switchbox issue (LCP has low power), Ef had thick clouds, data after 8:05 UT should be better

    Status

    ...


    Version as of 13:03, 20 Mar 2024

    This revision modified by gfparaschos (Ban)

    ...

    Station Fringe date comments
    Ef Yes 19.03.2024

    Ef had thick clouds, data after 8:05 UT should be better

    Nn Yes 19.03.2024 Good conditions at Nn (pad N011) also resetting the polyfix 6 (affecting LCP)
    Pv Yes 19.03.2024 Pv switchbox issue (LCP has low power),

    ...