Table of contents
Correlation Status
Project Code | Block Code | Sources | DOYS | UT | Freq | Stations | Status | PI | Comment |
---|---|---|---|---|---|---|---|---|---|
General comments
- ALMA scheduled, will have 3 MHz frequency offset
- LMT runs off Oscilloquartz xtal without H-maser/Rb
- Draft schedules v3: https://cloud.mpifr-bonn.mpg.de/index.php/s/J6SYRbxWJ8zMRF2
Recording media
Station | obs time [hr] | Required [TB] | Media | Capacity | Status (Nov 2022) |
---|---|---|---|---|---|
PT | 97 + 11.5 | 99 | MPI%8007 | 80 | |
NL | 97 + 11.5 | 99 | MPI%8008 | 80 | |
OV | 97 + 11.5 | 99 | MPI%8015 | 80 | |
MK | 67 + 11.5 | 72 | MPI%8019 | 80 | |
BR | 90 + 11.5 | 92 | MPI%8021 | 80 | |
FD | 97 + 11.5 | 99 | MPI%8028 | 80 | |
LA | 97 + 11.5 | 99 | MPI%8029 | 80 | |
KP | 97 + 11.5 | 99 | MPI%8026 | 80 | |
HN | 11.5 | 11 | MPIH%016 | 48 | |
SC | 11.5 | 11 | MPIH%017 | 48 | |
GB | 54 | 49 | |||
NOEMA | 83.5 | 73 | MPI%8022 MPI%8023 | 2 x 80 | |
ALMA | 55 | ||||
EF | 83.5 | 76 | e-transfer | ||
YS | 83.5 | 76 | e-transfer | ||
MH | 83.5 | 76 | e-transfer | ||
ON | 83.5 | 76 | e-transfer | ||
KVN | 53 / station | 48 / station | e-transfer | ||
LMT | 65 | < 59* | |||
ATCA | 39.5 | ||||
MOPRA | 39.5 | 36 | |||
GLT | 87 | 79 | |||
Haystack | 3.5 | 3 |
Notes:
Assuming 50% duty cyle for all stations
* LMT: based on 65 hours as indicated by the schedule, but LMT can only observe at night time. Requirements will be less
Preliminary pool:
128: 10
112: 10
80: 6
64: 8
48: 1
32: 1