Table of contents
- 1. Prerequists R2DBE
- 2. Prerequisits DBBC3
- 3.
- 4.
Prerequists R2DBE
- Go through the setup instructions and verify that the system is up and running.
- Make sure that the modules have been initialized, grouped and labeled.
Prerequisits DBBC3
- Go through the system setup procedure for the DBBC3 and verify that the system is in a working condition.
- Make sure that pv-mark6-3 and pv-mark6-4 are up and running