R2DBE system setup

    Table of contents

    Version as of 07:51, 18 Dec 2024

    to this version.

    Return to Version archive.

    View current version

    Pre-Checks

    • Check that the 1pps is connected to all R2DBE units (frontside)
    • Check that the IFs are connected to the Block Down Converter (BDC) with RCP and LCP as labeled on the backside
    • Check that the 10MHz signal is connected to the clock synthesizer unit
    • Check that the 10MHz signal is connected to the BDC unit
    • Check that the both IF input pins of all R2DBE units (frontside) are connected by cable
    • Check that all R2DBE units are connected by ethernet (PPC net port)  to the network hub box (backside)
    • Check that the noise generator unit is connected by ethernet to the network hub box (backside)
    • Check that all mark6 units are connected by ethernet cable to the the network hub box (backside)