    During the c162 GMVA campaign PV did not have fringes for unknown reasons. Several tests have been scheduled in DEc 2016 to verify the VLBI system at PV.


    Phase Noise

    The IF  signal (containing a line at 740 MHz) was fed to the phase noise measurement box which showed a phase jitter of around 30° in both polarizations. This is the value typically observed at PV at 3mm.

     

    0-baseline test using tone injected into the IF

    A tone was inserted onto the IF noise using a frequency generator. The IF was split and fed into both core boards of the DBBC2 and recorded on the Mark5B+.

    The DBBC2 was running the PFB V16 firmware and the channel selection was done following the normal GMVA setup:

    dbbcform=flex
    dbbctrk1=1,p-0,p-1,p-2,p-3,p-4,p-5,p-6,p-7,p-8,p-9,p-10,p-11,p-12,p-13,p-14,p-15
    dbbctrk1=2,v1-5,p-5,v1-6,p-6,v1-7,p-7,v1-8,p-8,v1-9,p-9,v1-10,p-10,v1-11,p-11,v1-12,p-12
    

    Tone injection at 856MHz so it should appear in the lowest (v1-5 and p-5) band:

    tone856.png

    vlbi2 output plot confirms the correct position of the tone.

    plot.png

    zerocorr output of the autocorrelations and cross-correlation spectra.