Table of contents
- 1. Meeting page:
- 2. Agenda
- 3. Presentations
- 4. Minutes
- 5. Action Items
Meeting page:
Agenda
- Local Arrangements/Opening Remarks (Colomer, Vicente)
- GMVA Technical Group (GTG) constitution
- overview of the GMVA. Purpose/mission of the GMVA Technical Group (Alef)
- discuss and agree on GTG statutes, meeting cadence etc. (all GMVA)
- appoint the GTG chair
-
- GMVA observations & operations
- Overview of observation preparation and operations e.g. pre-checks, DBBC2 news, FS news etc. (Bach)
- Overview support infrastructure,: FTP servers, web pages, mailing lists etc. (Rottmann)
- Discussion session (all)
- standardization of operational procedure
- fringe check procedure
- DBBC2 PFB mode, PFB firmware version
- FS schedule generation for PFB modes
- log file contents
- station session logs
- additional topics
-
-
- GMVA calibration
- Station reports on the current amplitude calibration strategy (every GMVA station 5-10 min)
- Discussion session (all)
- necessary steps to improve the calibration quality
- Tsys extraction in real-time
- opacity issues
- antab file generation
- calibration quality control at the correlator
- additional topics
-
-
- ALMA and GMVA
- Overview of the current state, ALMA commissioning and GMVA-ALMA tests (Rottmann, Alef)
- Discussion session (all)
- implications on GMVA operations
- additional topics
-
-
- AOB / closing remarks
Presentations
Station Reports:
Onsala (Jun Yang)
Pico Veleta (Salvador Sanchez)
Minutes
Action Items
- Rottmann, de Vicente: take a look at Yb DBBC configuration (investigate amplitude drop)
- Done. Setup was verified to be correct. Observed problems were probably due to bug in the DBBC2 PFB control software.
- All: Form small group to compile a pre-check list.
- Not done. Action item bumped to the updated list from the 2nd GTG meeting.
- MPIFR correlator: GMVA correlation reports should be made available online.
- Done. Correlation progress can be viewed under: https://deki.mpifr-bonn.mpg.de/GMVA/GMVA_correlations
- MPIfR correlator: Investigate possible PV phase jumps
- Done. Phase jumps did not appear in the follow up session. Problems were possibly related to defective power supply in the PV DBBC2 which eventually failed in autumn 2016