1st GTG Meeting Madrid February 8th, 2016 Redirected from GMVA/GMVA Technical Group/Madrid February 8th, 2016

    Agenda

    1. Local Arrangements/Opening Remarks (Colomer, Vicente)
    2. GMVA Technical Group (GTG) constitution
      • overview of the GMVA. Purpose/mission of the GMVA Technical Group (Alef)
      • discuss and agree on GTG statutes, meeting cadence etc. (all GMVA)
      • appoint the GTG chair
    3. GMVA observations & operations
      • Overview of observation preparation and operations e.g. pre-checks, DBBC2 news, FS news etc. (Bach)
      • Overview support infrastructure,: FTP servers, web pages, mailing lists etc. (Rottmann)
      • Discussion session (all)
        • standardization of operational procedure
        • fringe check procedure
        • DBBC2 PFB mode, PFB firmware version
        • FS schedule generation for PFB modes
        • log file contents
        • station session logs
        • additional topics
    4. GMVA calibration
      • Station reports on the current amplitude calibration strategy (every GMVA station 5-10 min)
      • Discussion session (all)
        • necessary steps to improve the calibration quality
        • Tsys extraction in real-time
        • opacity issues
        • antab file generation
        • calibration quality control at the correlator
        • additional topics
    5. ALMA and GMVA
      • Overview of the current state, ALMA commissioning and GMVA-ALMA tests (Rottmann, Alef)
      • Discussion session (all)
        • implications on GMVA operations
        • additional topics
    6. AOB / closing remarks


    Action Items

     

    1. Rottmann, de Vicente: take a look at Yb DBBC configuration (investigate amplitude drop)
      • Done. Setup was verified to be correct. Observed problems were probably due to bug in the DBBC2 PFB control software.
    2. All: Form small group to compile a pre-check list.
      • Not done. Action item bumped to the updated list from the 2nd GTG meeting.
    3. MPIFR correlator: GMVA correlation reports should be made available online.
    4. MPIfR correlator: Investigate possible PV phase jumps
    • Done.  Phase jumps did not appear in the follow up session. Problems were possibly related to defective power supply in the PV DBBC2 which eventually failed in autumn 2016
    Tag page (Edit tags)
    • No tags
    Pages that link here
    Page statistics
    2154 view(s), 22 edit(s) and 14244 character(s)

    Comments

    You must login to post a comment.