Tag page (Edit tags)
  • No tags
Pages that link here
Page statistics
681 view(s), 4 edit(s) and 920 character(s)

Comments

You must login to post a comment.

Attach file

Attachments

FileSizeDateAttached by 
 2012-05-30 - DA48 OSF Signal Path Connectivity Test Data Report.pdf
Upgrade Plan to add PIC and 1-PPS distributor to 64 station correlator
863.53 kB07:36, 25 Nov 2014mhechtActions
 2013-12-13-PIC_Sequence_Nrs_short.xls
Sum Data LVDS Cable List
82 kB07:36, 25 Nov 2014mhechtActions
 2013SEP12 ALMA-05.11.35.91-0001-A-REP.pdf
Incoming Inspection Report for Symmetricon XL-GPS
2.88 MB07:38, 1 Dec 2014mhechtActions
 2014-06-06-NRAO_APP_Misc_Cables.xlsx
Miscellaneous cables list
16.32 kB07:36, 25 Nov 2014mhechtActions
 2014-11-24-ALMA-05.11.30.03-0001-A-REP.doc
Correlator Upgrades Acceptance Report
591 kB07:56, 1 Dec 2014mhechtActions
 2014-11-25-ALMA-05.11.30.03-0002-A-REP.doc
Correlator Upgrades PAI Test Report
2.4 MB00:43, 4 Dec 2014mhechtActions
 2014-11-26-ALMA-05.11.31.05-0001-A-MAN.pdf
Correlator Upgrades Manual
3.3 MB01:24, 4 Dec 2014mhechtActions
 2014-12-01-ALMA-05.11.30.05-0001-A-MAN.docx
Correlator upgrades maintenance manual
7.14 MB06:38, 11 Dec 2014mhechtActions
 APP_Correlator_mods_V1.0_26APR13.pdf
APP Correlator modification description
112.25 kB07:36, 25 Nov 2014mhechtActions
 CR_Correlator_Nov2014.pdf
Report on Detection and Correction of Radiation Induced Events in Integrated Circuits of the ALMA Correlator High Site (updated)
170.99 kB07:07, 4 Dec 2014mhechtActions
GPSMANUAL.pdf
Symmetricom GPS Manual
2.27 MB06:46, 4 Dec 2014mhechtActions