C241A Correlation Report

    General information

    • Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
    • Station feedback: Gl late due to storm (https://docs.google.com/spreadsheets...gid=1941489491), bad weather at Pv in the beginning and at Ef, Ys lost scans 0376, 0377, Mh was offline 2024-04-19 1228 to 1400 UTC,  c241a was observed from 109-22:00 to 110-06:50 UT, 110-10:00 to 110-10:37 UT. Nn did not observe due to storm in the beginning, then due to a cabling error, we were on the "regular" 3mm band R&S SMA 100A synthesizer that was referenced to the maser (it should have sufficient quality for VLBI, however). We switched to the VLBI specific R&S SMA 100B just before starting c241b, and the following observations of c241b and c241c were done with it, Aa good, no KT

    Status

    what date
    started e-transfer for PV(2/2), Ys, On, Mh, sent email to KVN/Mp (awaiting start), Ef done 22.04.2024
    Fringes between Pv, On, Ys, Ef, Mh, sync error for Mh and probably Ys (missing frames) but only in the first few scans? 24.04.2024
    KVN data transfer started (complete), At & Mp still missing, but contacted via email to check 26.04.2024
       

    Fringes

    Station Fringes Plots Comments
    Ef y    
    Nn      
    Pv y    
    Ys y    
    Mh y    
    On y    
    Gl      
    KVN (3) y    
    VLBA(8)      

    Notes

    Post-Correlation checks

    Residuals

    FITS completeness (pclist)

    Tag page (Edit tags)
    • No tags
    Page statistics
    143 view(s), 24 edit(s) and 2872 character(s)

    Comments

    You must login to post a comment.

    Attach file

    Attachments