• You do not have permissions to view this page - please try logging in.
Table of contents

2013 May 07

The LOFAR HP switch was moved from the Effelsberg Faraday room to the RZ group in Bonn

 

Mice have been chewing on the data fiber connecting the S3 and S2 switches in the LOFAR container in Effelsberg.

IMG_2823.JPG IMG_2824.JPG

 

 

 

2013 May 13

Report by James M Anderson

Bad LBA RCUs (low power in spectra): 70, 76, 77,106

 

Bad HBA RCUs(funny spectra): 18,19,37,54

(Use following RCUs:   0:17,20:35,38:53,56:191)

 

 

2013 May 15

Effelsberg temperature history for two weeks.  The thermal stability is not as good as some other international stations.

DE601_temperature.png

Tag page (Edit tags)
  • No tags
Page statistics
1093 view(s), 6 edit(s) and 1359 character(s)

Comments

You must login to post a comment.