10 October

    Version as of 23:18, 22 Jul 2024

    to this version.

    Return to Version archive.

    View current version

    2012 October 15 -- October 17: Maintenance Visit

    Menno Norden and Henri Meulman visited from ASTRON to work on the station

    Updates etc. in the Container:
    • RCU modem firmware upgrade to version V12. This removes the DC from the communication line when it is not used.
    • Upgrade of the firmware of the TBB boot-loader. This is to improve the stability of the boards. (Less TBBs stuck in  "not available" and needing a 24V reset.)
    • RCU number 10 replaced, it had low gain in LBH
    LBA work:
    • replaced the antennas number: 4, 6, 19, 22, 27, 34, 35, 36, 37, 38, 39, 41, 43, 46, 52, 65, 69, 74, 75, 76, 82, 89, 92 (to get the RCU number multiply by two)
    • LBA 19 has one broken cable.
    HBA work:
    • Replaced HBA frontend boards (tile-number - FE-number): 19 - 15, 20 - 7, 20 - 11, 34 - 7, 52 - 15, 53 - 14, 71 - 9, 89 - 16
    Tests
    • Tested all antenneas and elements with a test transmitter.
    • Polarization tests of the HBA did not work, there is not enough space to put the test transmitter at the right distance in the right direction.

    2012 October 22

    Testing the station:

    HBAs are all fine as far as I can test:

    • modemtest without errors
    • all tiles gave a good looking signal

    LBAs:

    • RCU 74: low-power
    • RCU 119: high power at low frequencies, went away after going to rcumode 2 and back
    • all other LBAs are fine.