    2012 October 15 -- October 17: Maintenance Visit

    Menno Norden and Henri Meulman visited from ASTRON to work on the station

    Updates etc. in the Container:
    • RCU modem firmware upgrade to version V12. This removes the DC from the communication line when it is not used.
    • Upgrade of the firmware of the TBB boot-loader. This is to improve the stability of the boards. (Less TBBs stuck in  "not available" and needing a 24V reset.)
    • RCU number 10 replaced, it had low gain in LBH

     

    LBA work:
    • replaced the antennas number: 4, 6, 19, 22, 27, 34, 35, 36, 37, 38, 39, 41, 43, 46, 52, 65, 69, 74, 75, 76, 82, 89, 92 (to get the RCU number multiply by two)

     

    HBA work:
    • Replaced several broken HBA frontend modules.

     

    Tests
    • Tested all antenneas and elements with a test transmitter.