Table of contents

    Version as of 21:23, 22 Jul 2024

    to this version.

    Return to Version archive.

    View current version

    2013 May 07

    The LOFAR HP switch was moved from the Effelsberg Faraday room to the RZ group in Bonn

     

    Mice have been chewing on the data fiber connecting the S3 and S2 switches in the LOFAR container in Effelsberg.

    IMG_2823.JPG IMG_2824.JPG

    See the attachments

     

     

     

    2013 May 13

    Report by James M Anderson

    Bad LBA RCUs (low power in spectra): 70, 76, 77,106

     

    Bad HBA RCUs(funny spectra): 18,19,37,54

    (Use following RCUs:   0:17,20:35,38:53:56:191)