Table of contents
- 1. 2013 June 4
- 2. 2013 Jun 07
- 2.1.1. LBA:
- 2.1.2. HBA:
- 2.1.3. Report from Henri Muelman at ASTRON
2013 June 4
One disc in lofarB1 broke apparently late on June 2nd, disk was replaced by Effelsberg personel, computer is offline. (OS needs to be re-installed.)
2013 Jun 07
JMA
LBA:
RCUs 70 and 106 are broekn (flat response as if lying down)
RCU 74 has weird spectrum
HBA:
RCUs 54,55 have bad spectra