2013 May 07
The LOFAR HP switch was moved from the Effelsberg Faraday room to the RZ group in Bonn
Mice have been chewing on the data fiber connecting the S3 and S2 switches in the LOFAR container in Effelsberg.
2013 May 13
Report by James M Anderson
Bad LBA RCUs (low power in spectra): 70, 76, 77,106
Bad HBA RCUs(funny spectra): 18,19,37,54
(Use following RCUs: 0:17,20:35,38:53:56:191)