C241B Correlation Report

    General information

    • Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
    • Station feedback: Ef rainy (had to stop observing from 2h15 UT until 4h20 UT due to snow), Mh snowing, Ys good weather, lost scans 0068-->0155, Gl good weather, using circular feed, Gb cloudy, JCMT late due to some trouble, missed scan 732, windy, PV worked well but rain/snow stopped the observations at some point until scan No1242, wind was an issue at Nn, Aa good, no KT

    Status

    what date
    Contacted Ef (finished), KVN to start transfer (finished) 02.05.2024
    Fringes between Mk, Fd, Gb, and Ky, started e-transfer from Pv (finished) to connect VLBA to Eu 06.05.2024
    Fringe to NN (arrived 28.05.2024) 30.05.2024
    At transferred 25.06.2024
    Fringe to Aa detected 06.07.2024
    Mh finished 08.07.2024
    Started Ys transfer 24.07.2024
    Started On transfer
    25.07.2024

    Fringes

    Station Fringes Plots Comments
    VLBA(8) y    
    Gb y    
    Ef y    
    On y    
    Ys y    
    Pv y    
    Nn y    
    Mh y    
    KVN(3) y    
    Gl y    
    Aa y    
    At      
    Mp      
    Mm y    

    Notes

    Post-Correlation checks

    Residuals

    FITS completeness (pclist)

    Tag page (Edit tags)
    • No tags
    Pages that link here
    Page statistics
    1836 view(s), 32 edit(s) and 3069 character(s)

    Comments

    You must login to post a comment.

    Attach file

    Attachments