Table of contents
Day 1 (monday Mar. 28)
9:00 Welcome (Helge, Walter A.), organizational matters, around-the-table introductions
9:15 Correlator Reports (Roger, Dave, Kerry ?)
10:30 Coffee Break
11:00 Correlator Reports Part 2 (Walter B., Helge)
12:30 Lunch
13:45 DiFX and phased array operations (Adam)
14:30 DiFX for geodesy (Alessandra)
15:00 Demonstration of DiFX tools (Walter B.)
15:30 Coffee Break
16:00 Tour of the MPIfR compute cluster (Walter A.)
16:45 Open time / discussion
- RadioAstron support (James ?)
- Transients (Walter B. ?)
- other suggestions ?
18:00 Disband for the day
Day 2 (thursday, Mar. 31)
9:00 Meeting start
No agenda for this day. Focus on operational issues:
- GUI & current database schema (Helge)
- database extension: media-library framework (Helge)
- other suggestions.
12:30 Lunch
13:30 Departure to Effelsberg
14:30 Visit of 100m radio telescope
16:30 Return to Bonn
Talks
Dave Boboltz | USNO Status Report: SW Correlator & eVLBI | Boboltz_EVGA_meeting_Mar2011.pdf |
Roger Cappallo | Haystack Correlation Activities & Plans | Cappallo_Haystack status 2011.pdf |
Helge Rottmann | MPIfR Correlator Report | Rottmann_CorrelatorReport_2011.pdf |
Walter Brisken | Update on DifX at NRAO | Brisken_20110328_Difx_Bonn_NRAO.pdf |
Alessandra Bertarini | DiFX vs Mark IV: A Geodetic User‘s Perspective | Bertarini_bonn_difx.pdf |
Adam Deller | Phased Arrays in DiFX | Deller_difx_leap.pdf |
Martin Ettl | Unit testing | Ettl_simple_testsuite.doc.pdf |
Helge Rottmann | DiFX DB developments | Rottmann_DiFXDB_2011.pdf |
Walter Brisken | Summary of available DiFX programs / tools | http://cira.ivec.org/dokuwiki/doku.php/difx/utils |
Comments