2020-02-21_dbbc3 ddc

    Table of contents

    Version as of 00:01, 6 May 2024

    to this version.

    Return to Version archive.

    View current version

    Details

    Purpose of the test was to investigate a drop in amplitude of the last 4 BBCs of board C in the PV DBBC3 system. This drop has been seen during the GMVA fringe tests f191a and f192a.

    Test Setup

    The 4-8GHz noise source was connected to all 4 IF inputs of the DBBC3. The DDC_V 124 was loaded and all 32 BBCs were tuned to the same frequency. A test recording was done.

    Prior to the recording the system was checked by the monitorDDC.py script: PPS and samplers were in an OK state.

    Results

    The amplitude drop could be reproduced in the test

    board    
    A    
    B    
    C    
    D