C172B Correlation Report
General information
- Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
- Station feedback: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/sessions/sep17/feedback_sep17.asc
- C172B consists of only one subproject: MV001A.
- Initial correlation done with all stations, second correlation (fix Effelsberg incorrect channel order) done without KVN and Mh due to local cluster data loss and stations having deleted their own copies of the data. Final version is a combination of these two correlations, with non-Ef baselines taken from the initial correlation and Ef baselines -- from the later one with Mh and KVN missing. Thus there are no Ef-Mh and Ef-KVN baselines in the final correlation product.
Fringes
Station | Code | Fringes | Plots | Comments |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
| | | | |
Notes
- PV joined the schedule late (during the second 3C279 scan)
Post-Correlation checks
Residuals
FITS completeness (pclist)