Table of contents
- 1.1. General information
- 2. Scheduling
General information
This is a verification test for the NOEMA phasing system. The test will be carried out at 3mm.
Scheduling
Scheduling of the test will be dynamic, based on technical readiness and weather. One slot of duration 4hrs is triggered between 1.12. - 4.12.2020.
Contraints of the individual stations:
Station | Scheduling contrints |
---|---|
Ef | not available after 2.12. |
Ys | cannot join between 9:00 (1/12) - 13:00 (2/12), and probably not on 7:20-19:30 (3/12) |
On | can only join on the 1st December and 4th December (not 2+3) |
Pv | must be later than 12:00 for Dec 1st |
Setup
Due to the current limit of 4 formatter cards being available the test will be carried out in LSB dual-pol. Should additional cards become availble USB can be done too.
Station | LO | channel | sideband | Freqs | Notes |
---|---|---|---|---|---|
NOEMA | 92101 | LSB | 83101 - 86101 | 5-9 GHz IFs | |
PV | 92100 | 4 x 2 GHz | LSB | 83100 - 86100 | 5-9 GHz IFs |
On, Ys, Ef | 85500 | 16x64 MHz | USB | 86012 - 86524 | |
Fringes
Station | Code | Fringes | Plots | Comments |
---|---|---|---|---|
pNOEMA | ||||
PV | Pv | |||
Yebes | Ys | |||
Onsala | On | |||
Effelsberg | Ef | |||
Comments