    1. All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
      + Bach investigate use of HOLOG for creating beam maps

    2. All: Upgrade to SDK9.4 first at the correlators then at the stations.

    3. All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29

    4. Vicente: find atm binary talk to Himwich about possibility to inject opacity information into FS logs. Allor preferably source code for distribution, that can : everybody to switch to DBBC firmware version 107 Allbe used to : everybody to use latest Fila10G firmware Bachcalculate opacity from FS weather information and inject it into the : set up new 43 GHz receiver test with 2 GHz for VLBI, define frequency range log.Bach: send out details of solution, setting ports in SCHED, to stations

    5. Bach, Rottmann: look at EHT station set-up document and see if it could be modified for use in the EVN

    6. Bach: investigate how Tsys and opacity are determined at K band and higher at stations

    7. Rottmann and Leeuwinga: send emails to owners of 2 – 4 TB modules and ask what should be done with them.

    8. Rottmann: set up meeting with Verkouter, Kettenis, Alef, Rottmann and Wagner, to discuss the best format of VDIF packets.

    9. Marcote, Bach, Campbell: Better impact reporting discussion and/or implementation.

    10. Bach: invite group of interested/experts for working on DBBC3 support in the Field System.

    Version from 15:45, 6 Nov 2019

    This revision modified by ubach (Ban)

    ...

    1. All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps

    2. All: Upgrade to SDK9.4 first at the correlators then at the stations.

    3. All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29

    4. Vicente: talk to Himwich about possibility to inject opacity information into FS logs.

    5. All: everybody to switch to DBBC firmware version 107

    6. All: everybody to use latest Fila10G firmware

    7. Bach: set up new 43 GHz receiver test with 2 GHz for VLBI, define frequency range

    8. Bach: send out details of solution, setting ports in SCHED, to stations

    9. Bach, Rottmann: look at EHT station set-up document and see if it could be modified for use in the EVN

    10. Bach: investigate how Tsys and opacity are determined at K band and higher at stations

    11. Rottmann and Leeuwinga: send emails to owners of 2 – 4 TB modules and ask what should be done with them.

    12. Rottmann: set up meeting with Verkouter, Kettenis, Alef, Rottmann and Wagner, to discuss the best format of VDIF packets.

    Version as of 15:11, 18 May 2020

    This revision modified by ubach (Ban)

    ...

    1. All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
      + Bach investigate use of HOLOG for creating beam maps

    2. All: Upgrade to SDK9.4 first at the correlators then at the stations.

    3. All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29

    4. Vicente: find atm binary or preferably source code for distribution, that can be used to calculate opacity from FS weather information and inject it into the log.

    5. Bach, Rottmann: look at EHT station set-up document and see if it could be modified for use in the EVN

    6. Bach: investigate how Tsys and opacity are determined at K band and higher at stations

    7. Rottmann and Leeuwinga: send emails to owners of 2 – 4 TB modules and ask what should be done with them.

    8. Rottmann: set up meeting with Verkouter, Kettenis, Alef, Rottmann and Wagner, to discuss the best format of VDIF packets.

    9. Marcote, Bach, Campbell: Better impact reporting discussion and/or implementation.

    10. Bach: invite group of interested/experts for working on DBBC3 support in the Field System.