Table of contents
Combined revision comparison
...
-
All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
-
All: Upgrade to SDK9.4 first at the correlators then at the stations.
-
All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29
-
Vicente: talk to Himwich about possibility to inject opacity information into FS logs.
-
All: everybody to switch to DBBC firmware version 107
106 -
All: everybody to use latest Fila10G firmware
-
Bach: set up new 43 GHz receiver test with 2 GHz for VLBI, define frequency range
-
Bach: send out details of solution, setting ports in SCHED, to stations
-
Bach, Rottmann: look at EHT station set-up document and see if it could be modified for use in the EVN
-
Bach: investigate how Tsys and opacity are determined at K band and higher at stations
-
Rottmann and Leeuwinga: send emails to owners of 2 – 4 TB modules and ask what should be done with them.
-
Rottmann: set up meeting with Verkouter, Kettenis, Alef, Rottmann and Wagner, to discuss the best format of VDIF packets.
Version from 13:14, 14 Aug 2019
...
-
All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
-
All: Upgrade to SDK9.4 first at the correlators then at the stations.
-
All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29
-
Vicente: talk to Himwich about possibility to inject opacity information into FS logs.
-
All: everybody to switch to DBBC firmware version
106 -
All: everybody to use latest Fila10G firmware
-
Bach: set up new 43 GHz receiver test with 2 GHz for VLBI, define frequency range
-
Bach: send out details of solution, setting ports in SCHED, to stations
-
Bach, Rottmann: look at EHT station set-up document and see if it could be modified for use in the EVN
-
Bach: investigate how Tsys and opacity are determined at K band and higher at stations
-
Rottmann and Leeuwinga: send emails to owners of 2 – 4 TB modules and ask what should be done with them.
-
Rottmann: set up meeting with Verkouter, Kettenis, Alef, Rottmann and Wagner, to discuss the best format of VDIF packets.
Version as of 15:45, 6 Nov 2019
...
-
All: Beam-maps at L- and C-band and send them to Keimpema https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Beam_maps
-
All: Upgrade to SDK9.4 first at the correlators then at the stations.
-
All: 80 Hz continuous calibration. Update the table: https://deki.mpifr-bonn.mpg.de/Working_Groups/EVN_TOG/Continuous_calibration_%2880_Hz%29
-
Vicente: talk to Himwich about possibility to inject opacity information into FS logs.
-
All: everybody to switch to DBBC firmware version 107
-
All: everybody to use latest Fila10G firmware
-
Bach: set up new 43 GHz receiver test with 2 GHz for VLBI, define frequency range
-
Bach: send out details of solution, setting ports in SCHED, to stations
-
Bach, Rottmann: look at EHT station set-up document and see if it could be modified for use in the EVN
-
Bach: investigate how Tsys and opacity are determined at K band and higher at stations
-
Rottmann and Leeuwinga: send emails to owners of 2 – 4 TB modules and ask what should be done with them.
-
Rottmann: set up meeting with Verkouter, Kettenis, Alef, Rottmann and Wagner, to discuss the best format of VDIF packets.