Table of contents
You are currently comparing two old versions - only when you are comparing against the latest version can you revert. Return to version archive.
Combined revision comparison
...
- Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
- Station feedback:
- ALMA observed the first scan only (No0072 on 1741-038), then technical fault
was 1-dish, phasing failed due to having fewer dishes than the minimum required by the phasing software
- ALMA observed the first scan only (No0072 on 1741-038), then technical fault
- Correlation: In-beam phase referencing track (Sgr A* - IRS 7), stations (except ALMA) observed on P-Half position between the sources. Under v2d SOURCE P-Half needs two addPhaseCentre=... to form phase centers on Sgr A* and IRS 7.
...
Version from 13:40, 12 May 2025
...
- Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
- Station feedback:
- ALMA
was 1-dish, phasing failed due to having fewer dishes than the minimum required by the phasing software
- ALMA
- Correlation: In-beam phase referencing track (Sgr A* - IRS 7), stations (except ALMA) observed on P-Half position between the sources. Under v2d SOURCE P-Half needs two addPhaseCentre=... to form phase centers on Sgr A* and IRS 7.
...
Version as of 13:46, 12 May 2025
...
- Session info: http://www3.mpifr-bonn.mpg.de/div/vlbi/globalmm/
- Station feedback:
- ALMA observed the first scan only (No0072 on 1741-038), then technical fault
- Correlation: In-beam phase referencing track (Sgr A* - IRS 7), stations (except ALMA) observed on P-Half position between the sources. Under v2d SOURCE P-Half needs two addPhaseCentre=... to form phase centers on Sgr A* and IRS 7.
...