2021 Session II (c212)

This page can't be edited. | Page History
    Table of contents
    You are currently comparing two old versions - only when you are comparing against the latest version can you revert. Return to version archive.

    Combined revision comparison

    Comparing version 10:36, 30 Sep 2021 by rottmann with version 12:47, 1 Oct 2021 by rottmann.

    ...

    • GBT: Azimuth motors were limited to run at half the normal rate. Possibly some of the scans of the session were shortened due to this.
    • NOEMA: Timeserver on one of the polyfix units was not running leading to a timeshift between LCP and RCP in the beginning of the session including the fringe test. The issue was fixed at UT 9:00 on Oct 1st.
       

    ...

    Version from 10:36, 30 Sep 2021

    This revision modified by rottmann (Ban)

    ...

    Version as of 12:47, 1 Oct 2021

    This revision modified by rottmann (Ban)

    ...

    • GBT: Azimuth motors were limited to run at half the normal rate. Possibly some of the scans of the session were shortened due to this.
    • NOEMA: Timeserver on one of the polyfix units was not running leading to a timeshift between LCP and RCP in the beginning of the session including the fringe test. The issue was fixed at UT 9:00 on Oct 1st.
       

    ...