January 2019
- DBBC3 installation: DBBC3 was shipped back to PV. First checks indicate that the system has survived the transport without damage. For the EHT dress rehearsal the DBBC3 will be used for processing the USB, whereas the R2DBEs will process the LSB.
- BDC firmware upgrade: The BDC firmware has been upgraded to 3.2a to allow remote monitoring and control.
...